Case Histories 1-76
GBA CASE HISTORY # 47
A Member Firm was retained to perform a subsurface...
GBA CASE HISTORY # 46
Four years after an environmental consultant condu...
GBA CASE HISTORY # 45
An environmental consultant was retained to perfor...
GBA CASE HISTORY # 44
An environmental consultant performed a hurried Ph...
GBA CASE HISTORY # 43
Case History No. 43 A Member Firm did a favor for...
GBA CASE HISTORY # 42
Case History No. 42 An environmental consultant w...
GBA CASE HISTORY # 41
When two geotechnical engineering firms failed to ...
GBA CASE HISTORY # 40
Providing a low fee to a long-time client required...
GBA CASE HISTORY # 39
When a construction problem arose, the client assu...
GBA CASE HISTORY # 38
When the Member Firm's recommendations were not fo...
GBA CASE HISTORY # 37
A highway alignment project resulted in a resident...
GBA CASE HISTORY # 36
A GBA Member Firm performed a RCRA Facility Assess...
GBA CASE HISTORY # 35
Case History No. 35 A $4000, 17-day project was ...
GBA CASE HISTORY # 34
Case History No. 34 . The owner's desire to save a...
GBA CASE HISTORY # 33
Case History No. 33 . The press of business forced...