Refreshed GBA Case Histories have been downloaded over 2,000 times since May 1, 2017 and they are being used by GBA members for loss prevention discussions in support of professional development and mentoring.  Those who fail to learn the lessons of history are condemned to repeating mistakes of the past which is why GBA case histories are so valuable, and why GBA is updating them all, while adding new ones, too. Five more case histories have been issued.

CASE HISTORY NO. 26 (download)                   PROJECT MANAGEMENT

The Client

A multi-disciplinary consulting-engineering firm retained by an electric utility

The Project

A 12,000kW, fast-tracked, power-generating facility comprising a 110-foot-high rockfill dam, powerhouse, transmission line, and associated structures

Assignment of the GBA-Member Firm

Perform 6,000 feet of seismic-refraction transverses in the dam, penstock, dike, and powerhouse areas; reduce and interpret geophysical data obtained

CASE HISTORY NO. 27(download)                    PROJECT MANAGEMENT

The Client

A state-government agency

The Project

A 150-by-80-foot, single-story addition to a 100,000-square-foot educational building

Assignment of the GBA-Member Firm

Perform a geotechnical-engineering study and provide a report of findings and recommendations.

CASE HISTORY NO. 28(download)                    PROJECT MANAGEMENT

The Client

During the design phase, a municipality constructing a new library. During the construction phase, the project’s constructor-in-charge.

The Project

A small municipal library

Assignment of the GBA-Member Firm

Perform a geotechnical-engineering study for the owner and perform constructor quality control for the constructor, per owner requirements.

 CASE HISTORY NO. 29(download)                    PROJECT MANAGEMENT

The Client

A manufacturer of corrugated metal pipe (CMP)

The Project

Installation of a flexible CMP culvert in a drainage ditch designed to bypass surface water around a power-plant-construction project.

 Assignment of the GBA-Member Firm

Observe and test the compaction of fill beneath and on the sides of the CMP installation.

CASE HISTORY NO. 30(download)                    PROJECT MANAGEMENT

The Client

The owner of a food-storage warehouse

The Project

An addition to the existing warehouse

Assignment of the GBA-Member Firm

Perform a geotechnical-engineering study and submit a report including confirmation-dependent foundation recommendations, settlement analysis and estimates, earthwork recommendations, and a detailed description of construction-phase observation and documentation services.

 Access all GBA’s Case Histories HERE